MINIMAL ENQUIRY DATA
CLIENT PROJECT
Contact:
Project name/location:
Purpose/use of crane:
BOOM HEELPIN ELEVATION
(to ensure hoist has suffcient pull and hook fall)
ELEV (above water):
ft
m
STRUCTURE UPON WHICH THE CRANE IS MOUNTED
Bottom Supported Crane Base:
such as Platform or sunken Inland Barge rig
Floating Crane Base
TLP or SPAR
Semisubmersible
Drillship or FPSO
Ship or Barge in calm water
LIFT REQUIREMENTS
SWL
lb
Kg
@ RADIUS
ft
m
LIFT TYPE
HOOK
on-board
off-board
main
aux/fly
on-board
off-board
main
aux/fly
on-board
off-board
main
aux/fly
on-board
off-board
main
aux/fly
on-board
off-board
main
aux/fly
OPERATIONAL ENVIRONMENT (anticipated operational lift conditions, not storm or extreme conditions)
Method or Sea State:
Legacy Method
or General Method with wave height (Hsig) of:
ft
m
Wind Speed
Kt
MPH
Km/hr
m/s
Low Design Temperature
F
C
PRIME MOVER
Diesel Engine
Electric Motor @
VAC
PH
Hz
Fill out form, print screen and paste image into an email to info@Seacrane.us, or print form, fill out, scan and email.